- Who We Are
- What We Do
- Markets We Serve
-
Project Experience
-
Rail & Transit
- PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
- PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
- AMTRAK New Jersey High Speed Rail Improvement Program
- NJ Transit Morrisville Train Storage Yard, Phase II
- Elizabeth Train Station, Platform Replacement & Station Facilities
- Green Line Extension (GLX)
- PANYNJ Bus Terminal Replacement Program
-
Aviation
- PANYNJ ARK Terminal
- PANYNJ JFK Airport Infrastructure Improvements
- PANYNJ LGA Redevelopment Program
- PANYNJ LGA Substation & East Parking Garage
- PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
- PANYNJ On-Call CM Services at Newark Liberty International Airport
- PANYNJ JFK The New Terminal One
- PANYNJ JFK Terminal 4 Delta Expansion Phase 2
- PANYNJ JFK Airport Redevelopment Program
-
Water & Waste Water
- NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
- NYCDEP 26th Ward WWTP Reconstruction
- NYCDEP Avenue V Pumping Station & Force Main Upgrades
- NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
- NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
- NYCDEP Croton Water Filtration Plant
- NYCDEP Hunts Point Phase IV - Carbon Addition
- NYCDEP Hunts Point WWTP Phase I, II, III
- NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
- NYCDEP Kensico Flow Control Improvements
- NYCDEP Newtown Creek Waste Water Treatment Plant
- NYCDEP North River Co-Generation and Electrification Upgrades
- NYCDEP North River WWTP Contracts NR33 & NR35
- NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
- NYCDEP Upstate Watershed Miscellaneous Projects
- NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
- NYCDEP Wards Island WWTP Interim Plant Upgrade
- NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
- NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
- NYCDEP 26th Ward Emergency Generator Upgrade
- City of Baltimore DPW Druid Lakes
- City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
- City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
- City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
- Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
- Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
- DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
- DC Water Green Infrastructure in Rock Creek and Potomac River
- Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
- Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
- Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
- NYCDEP Flushing Bay CSO Retention Facility
- NYCDEP PW-101 Various BWT Locations
- NYCDEP Owls Head Wastewater Treatment Plant
- NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
-
Vertical Construction
- NJTA Facilities Improvements Program
- MTA-TBTA Wards Island Training Facility
- PANYNJ ARK Terminal
- Nassau County DPW Public Buildings
- PANYNJ Various Facilities Upgrades and Improvements
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
- Bristol Borough Public School District K-8 Grade School
- NJSCC Irvington School District Upgrades an Renovations at Various Schools
- NJSCC Victor Mravlag School No. 21
- School District of Philadelphia New Samuel Fels High School
- Verona Board of Education Laning School
- Verona Board of Education Southern Regional Middle School
- Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
- NYCHA Project Control Quality Assurance and Performance Management
- NYCHA Health Homes Department QA & Performance Management
- NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
-
Infrastructure
- NYCDDC Annadale Road Storm and Sanitary Sewer Lines
- NYCDDC Distribution Water Main Extensions and Replacement in South Queens
- NYCDDC Edgegrove and Ionia Avenue
- NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
- NYCDDC Green Infrastructure in Flushing Creek
- NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
- NYCDDC Installation of Storm Sewer in 115th Street in College Point
- NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
- NYCDDC Petroleum Storage Tanks Upgrade
- NYCDDC Reconstruction of Broadway Phase I
- NYCDDC Reconstruction of Clifford Place Step Street
- NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
- NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
- NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
- NYCDDC Sidewalks Rehabilitation and Reconstruction
- NYCDDC Storm and Sanitary Sewers in Harvest Avenue
- NYCDDC Storm and Sanitary Sewers in South Railroad Street
- NYCDDC Water Main work at Various Locations in Queens
- NYCEDC 125th Street and Park Avenue Public Realm
- NYCEDC Water Street Corridor Improvements
- No Image Test
-
Tunneling & Design-Build
- WMATA Section E-4B
- AMTRAK HDD under AMTRAK and CONRAIL Tracks
- Con Edison Unionport HDD
- East Windsor Township Water Main improvements through HDD
- NJ Transit ARC Tunnel
- PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
- PANYNJ Various Projects at Holland Tunnel
- PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
- Design & Engineering Services
-
Rail & Transit
- Announcements
NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
Project Scope
The Facility was built between 1939 and 1945, the 85-mile long Delaware Aqueduct supplies up to 1.2 billion gal/day of drinking water from upstate reservoirs to 9 million residents of New York City and its suburbs. Numerous shafts along the tunnel route provide access for maintenance and repair, flow measurement and control, and the addition of water treatment chemicals. Shafts 9, 10 and 17 are three major facilities located along the Delaware Aqueduct System in Westchester County. These facilities control water flow into the West Branch Reservoir at Shaft 9, out of the West Branch Reservoir at Shaft 10, and into the Kensico Reservoir at Shaft 17. The shaft structures, which were constructed in the 1940’s, have been in continuous operation since the installation of the mechanical equipment in the early 1950’s. Although the shafts still provide relatively reliable service, they clearly show their age, and they contain materials that pose a potential health risk. The goals of the project are to put the shafts in a condition to serve for many years into the future and comply with a consent order between the EPA, the NYSDOH and NYCDEP.
Site modifications vary by location and are as follows:
Shaft 9: Included replacing all existing sluice gates and operators; Remediate hazardous materials including lead paint, asbestos, mercury and PCBs; Install a mobile dechlorination feed facility including chemical unloading station; Construct a new water quality station; Replace un-watering pumps. Provide improved entrance road and parking area; Stabilize eroded embankment; Upgrade electrical and HVAC systems including back-up power; Shaft 10: Replace all existing sluice gates and operators; Remediate hazardous materials including lead paint, asbestos, mercury, and PCBs; Replace existing incremental valves and piping; Replace existing manually cleaned screens with mechanically cleaned screens. Install a new chlorination feed system in a building addition; Install a chlorine gas scrubber; Replace all un-watering and sump pumps ; Replace house water system, including a new separate potable water system; Construct a new water quality station. Provide improved entrance and parking area; Install a new emergency power generator in a dedicated structure; Dredge influent channel of sediment; Upgrade electrical and HVAC systems; Shaft 17: Replace all existing sluice gates and operators; Remediate hazardous materials including lead paint, asbestos, mercury and PCBs; Replace chemical feed and storage facilities, including chemical unloading stations; Replace all un-watering and sewage pumps; Install a new water quality station; Install a separate potable water system; Replace the flat roof over the Operator Building; Install an emergency power generator in a dedicated structure; Provide improved entrance and parking area; Upgrade electrical and HVAC systems; Stabilize eroded embankment.
Project Overview
Project Owner:
NYCDEP
Point of Contact Name:
Arcadis (Malcolm Pirnie) – Haley & Aldrich (JV)
44 South Broadway,
White Plains, NY 10601
Robert Vargo, PE
Construction Cost:
$155 million
Completion Date:
2010