- Who We Are
- What We Do
- Markets We Serve
-
Project Experience
-
Rail & Transit
- PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
- PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
- AMTRAK New Jersey High Speed Rail Improvement Program
- NJ Transit Morrisville Train Storage Yard, Phase II
- Elizabeth Train Station, Platform Replacement & Station Facilities
- Green Line Extension (GLX)
- PANYNJ Bus Terminal Replacement Program
-
Aviation
- PANYNJ ARK Terminal
- PANYNJ JFK Airport Infrastructure Improvements
- PANYNJ LGA Redevelopment Program
- PANYNJ LGA Substation & East Parking Garage
- PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
- PANYNJ On-Call CM Services at Newark Liberty International Airport
- PANYNJ JFK The New Terminal One
- PANYNJ JFK Terminal 4 Delta Expansion Phase 2
- PANYNJ JFK Airport Redevelopment Program
-
Water & Waste Water
- NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
- NYCDEP 26th Ward WWTP Reconstruction
- NYCDEP Avenue V Pumping Station & Force Main Upgrades
- NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
- NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
- NYCDEP Croton Water Filtration Plant
- NYCDEP Hunts Point Phase IV - Carbon Addition
- NYCDEP Hunts Point WWTP Phase I, II, III
- NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
- NYCDEP Kensico Flow Control Improvements
- NYCDEP Newtown Creek Waste Water Treatment Plant
- NYCDEP North River Co-Generation and Electrification Upgrades
- NYCDEP North River WWTP Contracts NR33 & NR35
- NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
- NYCDEP Upstate Watershed Miscellaneous Projects
- NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
- NYCDEP Wards Island WWTP Interim Plant Upgrade
- NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
- NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
- NYCDEP 26th Ward Emergency Generator Upgrade
- City of Baltimore DPW Druid Lakes
- City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
- City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
- City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
- Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
- Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
- DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
- DC Water Green Infrastructure in Rock Creek and Potomac River
- Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
- Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
- Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
- NYCDEP Flushing Bay CSO Retention Facility
- NYCDEP PW-101 Various BWT Locations
- NYCDEP Owls Head Wastewater Treatment Plant
- NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
-
Vertical Construction
- NJTA Facilities Improvements Program
- MTA-TBTA Wards Island Training Facility
- PANYNJ ARK Terminal
- Nassau County DPW Public Buildings
- PANYNJ Various Facilities Upgrades and Improvements
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
- Bristol Borough Public School District K-8 Grade School
- NJSCC Irvington School District Upgrades an Renovations at Various Schools
- NJSCC Victor Mravlag School No. 21
- School District of Philadelphia New Samuel Fels High School
- Verona Board of Education Laning School
- Verona Board of Education Southern Regional Middle School
- Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
- NYCHA Project Control Quality Assurance and Performance Management
- NYCHA Health Homes Department QA & Performance Management
- NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
-
Infrastructure
- NYCDDC Annadale Road Storm and Sanitary Sewer Lines
- NYCDDC Distribution Water Main Extensions and Replacement in South Queens
- NYCDDC Edgegrove and Ionia Avenue
- NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
- NYCDDC Green Infrastructure in Flushing Creek
- NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
- NYCDDC Installation of Storm Sewer in 115th Street in College Point
- NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
- NYCDDC Petroleum Storage Tanks Upgrade
- NYCDDC Reconstruction of Broadway Phase I
- NYCDDC Reconstruction of Clifford Place Step Street
- NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
- NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
- NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
- NYCDDC Sidewalks Rehabilitation and Reconstruction
- NYCDDC Storm and Sanitary Sewers in Harvest Avenue
- NYCDDC Storm and Sanitary Sewers in South Railroad Street
- NYCDDC Water Main work at Various Locations in Queens
- NYCEDC 125th Street and Park Avenue Public Realm
- NYCEDC Water Street Corridor Improvements
- No Image Test
-
Tunneling & Design-Build
- WMATA Section E-4B
- AMTRAK HDD under AMTRAK and CONRAIL Tracks
- Con Edison Unionport HDD
- East Windsor Township Water Main improvements through HDD
- NJ Transit ARC Tunnel
- PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
- PANYNJ Various Projects at Holland Tunnel
- PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
- Design & Engineering Services
-
Rail & Transit
- Announcements
Project Scope
The North River Water Pollution Control Plant (WPCP) is located in the Borough of Manhattan and operated by the City of New York Department of Environmental Protection. The plant receives and treats wastewater from residents and businesses on the west side of Manhattan, from Bank Street in Greenwich Village to Manhattan’s northern tip. Designed for an average flow of 170 million gallons per day (MGD) and a peak wet weather flow of 340 MGD, the plant provides secondary treatment through a step feed aerated activated sludge process. The plant’s treated effluent is discharged to the Hudson River, while the stabilized sludge is transported off-site
The West Odor Control System, designed by Pirnie-Baker and installed under Contract 27 in the early 1990’s, services the Primary Settling Tank ventilation system. This system is comprised of four wet scrubbers and twelve dual bed carbon adsorber units. During Contract 33 the following work will be performed:
- Installation of new motorized FRP dampers on all scrubber and carbon adsorber inlets and outlets.
- Elimination of bypass dampers between scrubber discharges and adsorber inlet plenum.
- Installation of new recirculation pumps.
- Replacement of existing scrubber media with Jaeger Tri-pack media.
- Replacement of all existing chemical metering pumps and associated piping as well as PH and ORP probes and controllers.
- Replacement of existing sprays nozzles within the scrubbers.
- Replacement of existing carbon in carbon adsorbers with new carbon.
- Construction of new plenum and installation of new fans for North Odor Control System.
In addition to the upgrading of the existing odor control systems under Contract 33, a number of process improvements are included in the contract:
- Extension of Baffle Walls within the Aeration Tanks
- Installation of new waste sludge line from RAS splitter box.
- Replacement of existing Dissolved Oxygen (DO) Control System.
- Replacement of existing 18-inch dumps valves for aeration tanks.
- Replacement of aeration tank diffusers and piping including new drop-legs and diffuser grid piping.
Project Overview
Project Owner:
NYCDEP
Point of Contact Name:
Arcadis (Malcolm Pirnie)
44 South Broadway
White Plains, NY 10601
Mark Hanson, PE
Construction Cost:
Contract #33 – $44 Million
Contract #35 – $88 Million
Completion Date:
Contract #33 – 2008
Contract #35 - 2011