- Who We Are
- What We Do
- Markets We Serve
-
Project Experience
-
Rail & Transit
- PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
- PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
- AMTRAK New Jersey High Speed Rail Improvement Program
- NJ Transit Morrisville Train Storage Yard, Phase II
- Elizabeth Train Station, Platform Replacement & Station Facilities
- Green Line Extension (GLX)
- PANYNJ Bus Terminal Replacement Program
-
Aviation
- PANYNJ ARK Terminal
- PANYNJ JFK Airport Infrastructure Improvements
- PANYNJ LGA Redevelopment Program
- PANYNJ LGA Substation & East Parking Garage
- PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
- PANYNJ On-Call CM Services at Newark Liberty International Airport
- PANYNJ JFK The New Terminal One
- PANYNJ JFK Terminal 4 Delta Expansion Phase 2
- PANYNJ JFK Airport Redevelopment Program
-
Water & Waste Water
- NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
- NYCDEP 26th Ward WWTP Reconstruction
- NYCDEP Avenue V Pumping Station & Force Main Upgrades
- NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
- NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
- NYCDEP Croton Water Filtration Plant
- NYCDEP Hunts Point Phase IV - Carbon Addition
- NYCDEP Hunts Point WWTP Phase I, II, III
- NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
- NYCDEP Kensico Flow Control Improvements
- NYCDEP Newtown Creek Waste Water Treatment Plant
- NYCDEP North River Co-Generation and Electrification Upgrades
- NYCDEP North River WWTP Contracts NR33 & NR35
- NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
- NYCDEP Upstate Watershed Miscellaneous Projects
- NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
- NYCDEP Wards Island WWTP Interim Plant Upgrade
- NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
- NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
- NYCDEP 26th Ward Emergency Generator Upgrade
- City of Baltimore DPW Druid Lakes
- City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
- City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
- City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
- Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
- Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
- DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
- DC Water Green Infrastructure in Rock Creek and Potomac River
- Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
- Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
- Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
- NYCDEP Flushing Bay CSO Retention Facility
- NYCDEP PW-101 Various BWT Locations
- NYCDEP Owls Head Wastewater Treatment Plant
- NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
-
Vertical Construction
- NJTA Facilities Improvements Program
- MTA-TBTA Wards Island Training Facility
- PANYNJ ARK Terminal
- Nassau County DPW Public Buildings
- PANYNJ Various Facilities Upgrades and Improvements
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
- Bristol Borough Public School District K-8 Grade School
- NJSCC Irvington School District Upgrades an Renovations at Various Schools
- NJSCC Victor Mravlag School No. 21
- School District of Philadelphia New Samuel Fels High School
- Verona Board of Education Laning School
- Verona Board of Education Southern Regional Middle School
- Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
- NYCHA Project Control Quality Assurance and Performance Management
- NYCHA Health Homes Department QA & Performance Management
- NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
-
Infrastructure
- NYCDDC Annadale Road Storm and Sanitary Sewer Lines
- NYCDDC Distribution Water Main Extensions and Replacement in South Queens
- NYCDDC Edgegrove and Ionia Avenue
- NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
- NYCDDC Green Infrastructure in Flushing Creek
- NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
- NYCDDC Installation of Storm Sewer in 115th Street in College Point
- NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
- NYCDDC Petroleum Storage Tanks Upgrade
- NYCDDC Reconstruction of Broadway Phase I
- NYCDDC Reconstruction of Clifford Place Step Street
- NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
- NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
- NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
- NYCDDC Sidewalks Rehabilitation and Reconstruction
- NYCDDC Storm and Sanitary Sewers in Harvest Avenue
- NYCDDC Storm and Sanitary Sewers in South Railroad Street
- NYCDDC Water Main work at Various Locations in Queens
- NYCEDC 125th Street and Park Avenue Public Realm
- NYCEDC Water Street Corridor Improvements
- No Image Test
-
Tunneling & Design-Build
- WMATA Section E-4B
- AMTRAK HDD under AMTRAK and CONRAIL Tracks
- Con Edison Unionport HDD
- East Windsor Township Water Main improvements through HDD
- NJ Transit ARC Tunnel
- PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
- PANYNJ Various Projects at Holland Tunnel
- PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
- Design & Engineering Services
-
Rail & Transit
- Announcements
Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
Project Scope
Techno, as a subconsultant to CH2M Hill, is providing Construction Inspection services for both the E2 and E3 contracts. The projects will be constructed under the guidelines of Nassau County’s Master Project Labor Agreement and, therefore, will each be using a single prime Construction Contractor (“CC”).
The Bay Park Sewage Treatment Plant is located in East Rockaway, NY. At the Plant, electric power flows from the Plant’s Main Engine Generators (four 3600 kW tri-fuel [diesel, natural gas, digester gas] units) to the 2400V Main Switchgear, the main distribution artery of the Plant.
The Phase E2 project includes the duplication of the function of one substation (USS No. 2) in a new air-conditioned Unit Substation No. 2 located at the site of the existing Aeration Odor Control Building (AOCB). Design of the new structure provides for reuse of piles and grade beams that serve the existing structure to be demolished, and additional foundation work to supplement the existing. Prior to demolition of the AOCB, a temporary odor control system serving the aeration tanks will be constructed and placed into service. Also, temporary power will be brought to the new biofilter equipment and ancillaries (currently under construction) for the interim period before new USS No. 2 is constructed and placed into service, after which permanent power from new USS No. 2 will be fed to the biofilter system. The Phase E2 construction will also include localized re-feeding of high voltage and low voltage cables in the vicinity of the existing substation, new substation (the loads served by same), and a cabinet for connection of a portable generator for back-up purposes.
The Phase E3 project includes the replacement of Utility Switchgear (fo merly LIPA,now PSE&G), the Plant’s Main Switchgear S1 that includes circuit breakers both for distributing power and for the raw sewage pumps, and Unit Substation No. 1; these will be located together with six 1 MW emergency generators at a new Main Substation (MSS). The project will include replacement of electrical ductbanks (cable, conduit, and concrete encasement) and re-feeding of high voltage cables from the new location of the Main Switchgear to the replacement substations constructed under all Phases (E1, E2, and E3), and to future new Switchgear S2 for a future new BNR Blower Building. Additional elements include a fiber optic ductbank to connect the Main Substation to the Phases unit substations for future Plant SCADA system, and replacement of site lighting buried conduits and conductors plus re-powering from new substations constructed under all Phases. Also included is demolition of the old LIPA utility switchgear near the main entrance and three 1000 kW Caterpillar emergency generators in the Oper tions Building.
Project Overview
Project Owner:
Nassau County DPW
Point of Contact Name:
Ms. Shila Shah-Gavnoudias, P.E., Commissioner
Nassau County Department of Public Works
Construction Cost:
Phase E2 - $22 million
Phase E3 - $143 million
Completion Date:
Phase E2 - 2017
Phase E3 - 2018