Techno Consult Inc.
  • Who We Are
    • Message From Our President
    • Company Overview
    • History
    • Leadership
  • What We Do
    • Construction Management
    • Resident Engineering & Inspection
    • Project Controls
    • Design & Engineering Related Services
  • Markets We Serve
    • Overview
    • Rail & Transit
    • Aviation
    • Water & Waste Water
    • Infrastructure
    • Vertical Construction
    • Tunneling & Design-Build
  • Project Experience
    • Rail & Transit
      • PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
      • PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
      • AMTRAK New Jersey High Speed Rail Improvement Program
      • NJ Transit Morrisville Train Storage Yard, Phase II
      • Elizabeth Train Station, Platform Replacement & Station Facilities
      • Green Line Extension (GLX)
      • PANYNJ Bus Terminal Replacement Program
    • Aviation
      • PANYNJ ARK Terminal
      • PANYNJ JFK Airport Infrastructure Improvements
      • PANYNJ LGA Redevelopment Program
      • PANYNJ LGA Substation & East Parking Garage
      • PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
      • PANYNJ On-Call CM Services at Newark Liberty International Airport
      • PANYNJ JFK The New Terminal One
      • PANYNJ JFK Terminal 4 Delta Expansion Phase 2
      • PANYNJ JFK Airport Redevelopment Program
    • Water & Waste Water
      • NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
      • NYCDEP 26th Ward WWTP Reconstruction
      • NYCDEP Avenue V Pumping Station & Force Main Upgrades
      • NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
      • NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
      • NYCDEP Croton Water Filtration Plant
      • NYCDEP Hunts Point Phase IV - Carbon Addition
      • NYCDEP Hunts Point WWTP Phase I, II, III
      • NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
      • NYCDEP Kensico Flow Control Improvements
      • NYCDEP Newtown Creek Waste Water Treatment Plant
      • NYCDEP North River Co-Generation and Electrification Upgrades
      • NYCDEP North River WWTP Contracts NR33 & NR35
      • NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
      • NYCDEP Upstate Watershed Miscellaneous Projects
      • NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
      • NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
      • NYCDEP Wards Island WWTP Interim Plant Upgrade
      • NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
      • NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
      • NYCDEP 26th Ward Emergency Generator Upgrade
      • City of Baltimore DPW Druid Lakes
      • City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
      • City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
      • City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
      • Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
      • Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
      • DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
      • DC Water Green Infrastructure in Rock Creek and Potomac River
      • Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
      • Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
      • Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
      • NYCDEP Flushing Bay CSO Retention Facility
      • NYCDEP PW-101 Various BWT Locations
      • NYCDEP Owls Head Wastewater Treatment Plant
      • NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
    • Vertical Construction
      • NJTA Facilities Improvements Program
      • MTA-TBTA Wards Island Training Facility
      • PANYNJ ARK Terminal
      • Nassau County DPW Public Buildings
      • PANYNJ Various Facilities Upgrades and Improvements
      • NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
      • Bristol Borough Public School District K-8 Grade School
      • NJSCC Irvington School District Upgrades an Renovations at Various Schools
      • NJSCC Victor Mravlag School No. 21
      • School District of Philadelphia New Samuel Fels High School
      • Verona Board of Education Laning School
      • Verona Board of Education Southern Regional Middle School
      • Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
      • NYCHA Project Control Quality Assurance and Performance Management
      • NYCHA Health Homes Department QA & Performance Management
      • NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
    • Infrastructure
      • NYCDDC Annadale Road Storm and Sanitary Sewer Lines
      • NYCDDC Distribution Water Main Extensions and Replacement in South Queens
      • NYCDDC Edgegrove and Ionia Avenue
      • NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
      • NYCDDC Green Infrastructure in Flushing Creek
      • NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
      • NYCDDC Installation of Storm Sewer in 115th Street in College Point
      • NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
      • NYCDDC Petroleum Storage Tanks Upgrade
      • NYCDDC Reconstruction of Broadway Phase I
      • NYCDDC Reconstruction of Clifford Place Step Street
      • NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
      • NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
      • NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
      • NYCDDC Sidewalks Rehabilitation and Reconstruction
      • NYCDDC Storm and Sanitary Sewers in Harvest Avenue
      • NYCDDC Storm and Sanitary Sewers in South Railroad Street
      • NYCDDC Water Main work at Various Locations in Queens
      • NYCEDC 125th Street and Park Avenue Public Realm
      • NYCEDC Water Street Corridor Improvements
      • No Image Test
    • Tunneling & Design-Build
      • WMATA Section E-4B
      • AMTRAK HDD under AMTRAK and CONRAIL Tracks
      • Con Edison Unionport HDD
      • East Windsor Township Water Main improvements through HDD
      • NJ Transit ARC Tunnel
      • PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
      • PANYNJ Various Projects at Holland Tunnel
      • PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
    • Design & Engineering Services
      • NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
      • NYCDDC Preliminary & Final Design Services for Non-Standard Pedestrian Ramps, Borough of Brooklyn & Staten Island
      • NYCEDC Preliminary and Final Design for Queensway Phase 1
  • Announcements
  • Careers
  • Contact Us

Design & Engineering Services

  • Rail & Transit
    • PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
    • PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
    • AMTRAK New Jersey High Speed Rail Improvement Program
    • NJ Transit Morrisville Train Storage Yard, Phase II
    • Elizabeth Train Station, Platform Replacement & Station Facilities
    • Green Line Extension (GLX)
    • PANYNJ Bus Terminal Replacement Program
  • Aviation
    • PANYNJ ARK Terminal
    • PANYNJ JFK Airport Infrastructure Improvements
    • PANYNJ LGA Redevelopment Program
    • PANYNJ LGA Substation & East Parking Garage
    • PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
    • PANYNJ On-Call CM Services at Newark Liberty International Airport
    • PANYNJ JFK The New Terminal One
    • PANYNJ JFK Terminal 4 Delta Expansion Phase 2
    • PANYNJ JFK Airport Redevelopment Program
  • Water & Waste Water
    • NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
    • NYCDEP 26th Ward WWTP Reconstruction
    • NYCDEP Avenue V Pumping Station & Force Main Upgrades
    • NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
    • NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
    • NYCDEP Croton Water Filtration Plant
    • NYCDEP Hunts Point Phase IV - Carbon Addition
    • NYCDEP Hunts Point WWTP Phase I, II, III
    • NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
    • NYCDEP Kensico Flow Control Improvements
    • NYCDEP Newtown Creek Waste Water Treatment Plant
    • NYCDEP North River Co-Generation and Electrification Upgrades
    • NYCDEP North River WWTP Contracts NR33 & NR35
    • NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
    • NYCDEP Upstate Watershed Miscellaneous Projects
    • NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
    • NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
    • NYCDEP Wards Island WWTP Interim Plant Upgrade
    • NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
    • NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
    • NYCDEP 26th Ward Emergency Generator Upgrade
    • City of Baltimore DPW Druid Lakes
    • City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
    • City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
    • City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
    • Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
    • Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
    • DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
    • DC Water Green Infrastructure in Rock Creek and Potomac River
    • Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
    • Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
    • Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
    • NYCDEP Flushing Bay CSO Retention Facility
    • NYCDEP PW-101 Various BWT Locations
    • NYCDEP Owls Head Wastewater Treatment Plant
    • NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
  • Vertical Construction
    • NJTA Facilities Improvements Program
    • MTA-TBTA Wards Island Training Facility
    • PANYNJ ARK Terminal
    • Nassau County DPW Public Buildings
    • PANYNJ Various Facilities Upgrades and Improvements
    • NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
    • Bristol Borough Public School District K-8 Grade School
    • NJSCC Irvington School District Upgrades an Renovations at Various Schools
    • NJSCC Victor Mravlag School No. 21
    • School District of Philadelphia New Samuel Fels High School
    • Verona Board of Education Laning School
    • Verona Board of Education Southern Regional Middle School
    • Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
    • NYCHA Project Control Quality Assurance and Performance Management
    • NYCHA Health Homes Department QA & Performance Management
    • NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
  • Infrastructure
    • NYCDDC Annadale Road Storm and Sanitary Sewer Lines
    • NYCDDC Distribution Water Main Extensions and Replacement in South Queens
    • NYCDDC Edgegrove and Ionia Avenue
    • NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
    • NYCDDC Green Infrastructure in Flushing Creek
    • NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
    • NYCDDC Installation of Storm Sewer in 115th Street in College Point
    • NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
    • NYCDDC Petroleum Storage Tanks Upgrade
    • NYCDDC Reconstruction of Broadway Phase I
    • NYCDDC Reconstruction of Clifford Place Step Street
    • NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
    • NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
    • NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
    • NYCDDC Sidewalks Rehabilitation and Reconstruction
    • NYCDDC Storm and Sanitary Sewers in Harvest Avenue
    • NYCDDC Storm and Sanitary Sewers in South Railroad Street
    • NYCDDC Water Main work at Various Locations in Queens
    • NYCEDC 125th Street and Park Avenue Public Realm
    • NYCEDC Water Street Corridor Improvements
    • No Image Test
  • Tunneling & Design-Build
    • WMATA Section E-4B
    • AMTRAK HDD under AMTRAK and CONRAIL Tracks
    • Con Edison Unionport HDD
    • East Windsor Township Water Main improvements through HDD
    • NJ Transit ARC Tunnel
    • PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
    • PANYNJ Various Projects at Holland Tunnel
    • PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
  • Design & Engineering Services
    • NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
    • NYCDDC Preliminary & Final Design Services for Non-Standard Pedestrian Ramps, Borough of Brooklyn & Staten Island
    • NYCEDC Preliminary and Final Design for Queensway Phase 1

< Back to project experience

NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of BrooklynNYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of BrooklynView
NYCDDC Preliminary & Final Design Services for Non-Standard Pedestrian Ramps, Borough of Brooklyn & Staten IslandNYCDDC Preliminary & Final Design Services for Non-Standard Pedestrian Ramps, Borough of Brooklyn & Staten IslandView
NYCEDC Preliminary and Final Design for Queensway Phase 1NYCEDC Preliminary and Final Design for Queensway Phase 1View
  • Techno Consult Inc.
  • NEW JERSEY

    5 Independence Way, Suite 150
    Princeton, NJ 08540
    TEL  609.720.1200

  • NEW YORK

    14 Penn Plaza, Suite 2220
    New York, NY 10122
    TEL  212.465.8100

  • EMPLOYEE PORTAL

    Login

  • CONNECT WITH TECHNO

    Email

© 2025 Techno Consult Inc. All Rights Reserved. Powered by SoSimple
  • Who We Are
  • What We Do
  • Markets We Serve
  • Project Experience
  • Announcements
  • Employee Portal
  • Careers
  • Contact Us