- Who We Are
- What We Do
- Markets We Serve
-
Project Experience
-
Rail & Transit
- PANYNJ Port Authority Bus Terminal Facility Upgrades and Improvements
- PANYNJ Replacement & Upgrade of the Christopher Street Substation & Harrison Station
- AMTRAK New Jersey High Speed Rail Improvement Program
- NJ Transit Morrisville Train Storage Yard, Phase II
- Elizabeth Train Station, Platform Replacement & Station Facilities
- Green Line Extension (GLX)
- PANYNJ Bus Terminal Replacement Program
-
Aviation
- PANYNJ ARK Terminal
- PANYNJ JFK Airport Infrastructure Improvements
- PANYNJ LGA Redevelopment Program
- PANYNJ LGA Substation & East Parking Garage
- PANYNJ Newark Liberty (EWR) Airport Terminal 1 Redevelopment
- PANYNJ On-Call CM Services at Newark Liberty International Airport
- PANYNJ JFK The New Terminal One
- PANYNJ JFK Terminal 4 Delta Expansion Phase 2
- PANYNJ JFK Airport Redevelopment Program
-
Water & Waste Water
- NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
- NYCDEP 26th Ward WWTP Reconstruction
- NYCDEP Avenue V Pumping Station & Force Main Upgrades
- NYCDEP Catskill and Delaware Water Treatment Ultra Violet Facility
- NYCDEP Coney Island Primary Settling Tanks Odor Control & Building Reconstruction
- NYCDEP Croton Water Filtration Plant
- NYCDEP Hunts Point Phase IV - Carbon Addition
- NYCDEP Hunts Point WWTP Phase I, II, III
- NYCDEP Hunts Point WWTP Phase III Digestors Upgrade
- NYCDEP Kensico Flow Control Improvements
- NYCDEP Newtown Creek Waste Water Treatment Plant
- NYCDEP North River Co-Generation and Electrification Upgrades
- NYCDEP North River WWTP Contracts NR33 & NR35
- NYCDEP Rehabilitation of Delaware Aqueduct Shafts 9, 10 & 17 and Other Related Facilities
- NYCDEP Upstate Watershed Miscellaneous Projects
- NYCDEP Wards Island Grit Chambers Reconstruction in Manhattan and Bronx
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facility Upgrades
- NYCDEP Wards Island WWTP Interim Plant Upgrade
- NYCDEP Cross River Croton Falls Pumping Station and Related Facilities Upgrades
- NYCDEP Rockaway WWTP Super Storm Sandy Emergency Recovery Services
- NYCDEP 26th Ward Emergency Generator Upgrade
- City of Baltimore DPW Druid Lakes
- City of Baltimore DPW Headworks & Wet Equalization at the Back River WWTP
- City of Baltimore DPW Old York Road and Vicinity Water Mains Replacements
- City of Baltimore DPW Water Main Replacements and Sewer Rehabilitation
- Nassau County DPW Bay Park Sewage Treatment Plant Electrical Distribution System Phases E2 & E3
- Nassau County DPW WPCP Phase I, Storm Water Pumping Station, East Rockaway, NY
- DC Water Utilities & Infrastructure Upgrades outside Blue Plains WWTP
- DC Water Green Infrastructure in Rock Creek and Potomac River
- Nassau County DPW Glen Cove WWTP - Sludge Dewatering Improvements
- Nassau County DPW Glen Cove Wastewater Treatment Plant Preliminary Treatment System Improvements
- Nassau County DPW Cedar Creek Wastewater Treatment Plant for the Electrical Improvement System
- NYCDEP Flushing Bay CSO Retention Facility
- NYCDEP PW-101 Various BWT Locations
- NYCDEP Owls Head Wastewater Treatment Plant
- NYCDEP BNR Upgrades at the Coney Island & Rockaway Wastewater Treatment Plants
-
Vertical Construction
- NJTA Facilities Improvements Program
- MTA-TBTA Wards Island Training Facility
- PANYNJ ARK Terminal
- Nassau County DPW Public Buildings
- PANYNJ Various Facilities Upgrades and Improvements
- NYCDEP Wards Island WWTP Chemical & Petroleum Bulk Storage Facilities Upgrade
- Bristol Borough Public School District K-8 Grade School
- NJSCC Irvington School District Upgrades an Renovations at Various Schools
- NJSCC Victor Mravlag School No. 21
- School District of Philadelphia New Samuel Fels High School
- Verona Board of Education Laning School
- Verona Board of Education Southern Regional Middle School
- Woodcliff Lake School District Woodcliff Middle Lake School and Dorchester Elementary School
- NYCHA Project Control Quality Assurance and Performance Management
- NYCHA Health Homes Department QA & Performance Management
- NYCHA Oversight for Boiler Replacement and DHWS at Johnson and Mott Haven Houses
-
Infrastructure
- NYCDDC Annadale Road Storm and Sanitary Sewer Lines
- NYCDDC Distribution Water Main Extensions and Replacement in South Queens
- NYCDDC Edgegrove and Ionia Avenue
- NYCDDC Preliminary & Final Design Services for Complex Pedestrian Ramps, Borough of Brooklyn
- NYCDDC Green Infrastructure in Flushing Creek
- NYCDDC Installation of Distribution Water Mains and Appurtenances for New Building Construction in Manhattan
- NYCDDC Installation of Storm Sewer in 115th Street in College Point
- NYCDDC Multi-Site Pedestrian Safety Improvements in Manhattan
- NYCDDC Petroleum Storage Tanks Upgrade
- NYCDDC Reconstruction of Broadway Phase I
- NYCDDC Reconstruction of Clifford Place Step Street
- NYCDDC Reconstruction of Flushing Avenue -- Brooklyn Waterfront Greenway Initiative
- NYCDDC Replacements of Storm & Sanitary Sewer and Water Main on 58th Avenue and 185th Street
- NYCDDC Resurfacing, Pavement Improvements and General Repairs at Various Locations
- NYCDDC Sidewalks Rehabilitation and Reconstruction
- NYCDDC Storm and Sanitary Sewers in Harvest Avenue
- NYCDDC Storm and Sanitary Sewers in South Railroad Street
- NYCDDC Water Main work at Various Locations in Queens
- NYCEDC 125th Street and Park Avenue Public Realm
- NYCEDC Water Street Corridor Improvements
- No Image Test
-
Tunneling & Design-Build
- WMATA Section E-4B
- AMTRAK HDD under AMTRAK and CONRAIL Tracks
- Con Edison Unionport HDD
- East Windsor Township Water Main improvements through HDD
- NJ Transit ARC Tunnel
- PANYNJ Superstorm Sandy Emergency Projects at Holland Tunnel
- PANYNJ Various Projects at Holland Tunnel
- PANYNJ Various Projects at Holland & Lincoln Tunnel Rehabilitation and Repair Projects
- Design & Engineering Services
-
Rail & Transit
- Announcements
Project Scope
Techno is part of the WSP team for providing CM and REI services to the Port Authority for the $2.7B Design-Build new Terminal A at Newark International Airport. Techno’s staff is currently supporting all CM activity related to:
Techno’s CM Staff is working on various aspects of this project which include:
New Terminal
- A one-million-square-foot LEED Silver, flexible, 33-gate, common-use terminal building that will accommodate the 13.6 MAP forecast for 2027. The current concept includes a two-level T-shaped building with a central headhouse and a single secure concourse with single loaded north, and south piers, and a doubleloaded Eastern pier.
- A weather-protected, climate-controlled, above-grade pedestrian bridge, with moving walkways for passenger convenience linking the terminal and the parking garage, and also providing a current and future link to AirTrain.
Airside Infrastructure
- 140 acres of aeronautical paving contiguous with the new terminal and the existing adjacent airfield system that supports 33 ADG III Aircraft gates, dual ADG V taxi-lanes (North), dual ADG IV taxi-lanes (South), HOS/ TOS service roads and RON & GSE staging areas for the Terminal A Program.
- Demolition of the existing Terminal A satellites and all associated infrastructure.
- Hydrant fueling pits and associated equipment at all gates.
Landside Infrastructure
- A new roadway network connecting the New Terminal program with the Central Terminal Area which consists of eight new bridges, elevated and at grade frontage roads, loading dock approaches, ground transportation passenger pickup/drop-off areas, taxi-queue and bus pick-up/drop-off areas.
New Terminal Parking Garage and Toll Plaza Facility
- An “open”, naturally ventilated tiered garage structure and surface lot with approximately 3,000 close-in spots, a toll plaza facility and all other associated accessories needed to connect to the toll collection system at the airport.
Project Overview
Project Owner:
PANYNJ
Point of Contact Name:
WSP America
Ray Moran, PE
Project Director
Construction Cost:
$2.7 Billion
Completion Date:
2022