NYCDEP 26th Ward WWTP Preliminary Treatment Reliability Improvements and High Level Sewage Pump Replacement
1. Blowers remediation, Pump and Blower House – Personnel Areas:
- Demolition of existing blowers, Furnishing and installing five (5) turbo blowers, including alternate air intake for blower #3, new substation for all blowers. Test and place blowers into satisfactory operation.
- Converting old locker room into new transformer room, rehabilitation of first floor facilities and constructing new locker facilities on 2nd and 3rd floors, including new HVAC system.
- Furnishing spare parts as required by detailed specification.
2. Flow Division Structure/Preliminary Settling Tanks:
- Constructing new additional preliminary settling tank PST#5 adjacent east of PST #4 located near former area of demolished ammonia building, including bulkhead chamber above existing influent channel between PST 3 and 4, new primary sludge gallery, MCC #25 and scum pit.
- Constructing new flow division structure, including its associated tapered channel and 42” raw sewage pipe.
- Modifications to primary sludge gallery and tanks PST#1, 2, 3, 4, including its associated walls, channels, weirs, underground pipes, manholes and other appurtenance.
- Re-route main raw sewage flow through new FDS making tap connection into existing 78” raw sewage, capping 36” Alaskan pump discharge header.
- Furnish spare parts as required by detailed specification.
3. BNR building:
- Demolish existing Glycerol System, set up new sodium hydroxide storage tank, including containment masonry enclosure with electrical, HVAC, and fire protection system installation.
4. Submersible (Alaskan) pumps replacement:
- Remove, install, test and place into satisfactory operation two (2) new submersible pumps.
- Replacement submersible pumps will be furnished by City.
5. Replacement of three (3) existing spool pieces:
- Remove and replace of existing suction spool pieces associated with main sewage pump number 2, 3 and 1, including suction gate valves and actuators.
6. Replacement of three (3) high level main sewage pumps:
- Remove existing, furnish and install new main sewage pump number 2, 3 and 1 including all associated power and control modifications to switchgear cubicle, mimic panel and
- Test and place into satisfactory operation.
7. Replacement of seal water system