The project involved the construction of new sanitary sewers and new storm sewers in a multitude of roadways. Sanitary sewers were placed in South Rail-road Street between Albee Ave & Annadale Road, in Annadale Road between Sneden Ave & Hillis Street, in Buffington Ave between Albee Ave & South Rail-road Street, in Downes Ave between Albee Ave & South Railroad Street, in Ely Ave between Downes Ave & Tenafly Place, in North Pine Terr. between South Railroad Street & Annadale Road, and in East Tenefly Ave between North Pine Terrace & South Railroad Street. 

New storm sewers were placed in Arden Ave between Whalley Ave & Sneden Ave, in Sneden Ave between Annadale Road & Arden Ave, in South Railroad Street between Albee Ave & Annadale Road, in Annadale Road between Sneden Ave & Hillis Street, in Buffington Ave between Albee Ave & South Rail-road Street, in Downes Ave between Albee Ave and South Railroad Street, in Ely Ave between Downes Ave & Tenafly Place, in North Pine Terrace between South Railroad & Annadale Road, and in East Tenafly Ave between North Pine Terrace & South Railroad Street.

Quantities:

  1. Annadale Road between South Railroad Street & Hillis Street
  2. South Railroad Street between East Tenafly Ave & North Pine Terr.
    1. Storm Sewer: Total length = 6,000 LF
    2. Sanitary Sewer: Total length = 10,000 LF
    3. Water Main: Total length = 6,000 LF
Description
Estimated
Actual
Unit
Reconstruction 37,000 17,192 SY
Trees 32 0 #
Distribution Mains (Lay) – Replaced 4,575 3,922 LF
Hydrants 7 0 #
Sanitary Sewer – New 5,032 4,962 LF
Storm Sewer – New 6,289 5,545 LF
Catch Basins 74 0 #
Manholes/Chambers 91 0 #