NYCDDC Reconstruction of Broadway Phase I
The project involves the replacement of aged water mains, sewers, street lights, traffic signals, and utilities on Broadway from Ann to Rector Streets, including a new roadway with sidewalks and curbs.
The project included mass excavation of the entire roadway to a depth of 5 feet to expose utilities and identify and remove abandoned facilities; Con Ed replacement and relocation of conduits, chambers, gas mains, steam lines and other utilities; New York City Transit protection of ducts, chambers, vaults, en-trances, emergency exits, and ventilation structures; water main replacement and upgrade (12”, 20”, and 24”); sewer rehabilitation; curbs, sidewalks, fire alarms, street lights, and traffic signals; roadway restoration and removal of trolley tracks; and tree mitigation.
In addition, the project included Safety and Maintenance and Protection of Traffic for high volumes of pedestrian and vehicular traffic and to maintain access to business and subway entrances.